Early engagement allowed for cultural of collaborative working to be developed leading to optimum solution to be delivered whilst keeping tight cost controls.
Home »
Kelloe STW
Project Overview
The FST package consisted of: 2-OFF ULTRASTORE® Stainless Steel Tanks, fitted with internal launder systems.
Access steelwork: Each tank was fitted with a fully integrated peripheral walkway. Access stairs were provided to gain access from ground level on to the walkway and then from the walkway on to the top of the De-Sludge Chamber.
Half bridge rotating scraper systems.
1-OFF 6.1m high Precast Concrete Desludging Chamber.
1-OFF 4.2m Innovative Distribution Chamber.
As part of our total package solution on top of the supply of the tank wall, Stortec carried out:
- All necessary ground works.
- The controlled dismantle of the old Glass Coated Steel Tank.
- The design and installation of the replacement tank.
- New Stainless Steel Pipework and valves.
- Internal sacrificial anodes protection system.
- A replacement innovative Stainless Steel decant chamber.
Our total package approach is proven to eradicate traditional interfaces and significantly reduce programme and costs.
Client
End User
Northumbrian Water PLC
Value
- £525,000.00
Scope
- Final Settlement Tank Package
- 1-OFF NSAF Tank
Tank
- Final Settlement Tank Package
- 1-OFF NSAF Tank
Diameter
- Final Settlement Tank Package: 6,831mm
- 1-OFF NSAF Tank: 5,123mm
Height
- Final Settlement Tank Package: 4,118mm
- 1-OFF NSAF Tank: 5,518mm
Volume
- Final Settlement Tank Package: 132m³
- 1-OFF NSAF Tank: 103m³