Stortec carried out initial excavation works and Civil wors including the bund. Three bespoke tank bases were installed in preparation of tank installation, all work carried out by Stortec with a permanent StortecSite Manager.
Home »
Park Farm AD
Project Overview
All elements of the project carried out by Stortec including pipework, Steelwork, electrical and mechanical works. The Ground Mounted Gas Holder installed is a Stortec designed double membrane Biodome®.
ULTRASTORE® Stainless Steel Tank Installed using our specialist Jacking Equipment.
The main advantages of a Stainless-steel system:
- From an environmental point of view the material is made of 85% recycled material already and on at the end of the asset life it is 100% recyclable.
- From a Design Life Point it offers a minimum 10-year long life then any coating system on the market.
- It is more robust when handled and is less susceptible to damage in service.
- From a CAPEX point of view Stainless is very comparable when compared to traditional coated tanks.
Client
Park Farm AD
End User
Private
Value
-
£9,800,000
Scope
-
Design and construction of AD plant (Principle Contractor & Designer)
Tank
- 2-OFF Digester Tanks
- 1-OFF Hydrolosis Tank
Diameter
- Digester Tanks: 23,910mm
- Hydrolosis Tank: 13,663mm
Height
- Digester Tanks: 10,119mm
- Hydrolosis Tank: 9,760mm
Volume
- Digester Tanks: 3,850m³
- Hydrolosis Tank: 1,200m³